01 – The challenge
In Kpetchihoe, Togo, groundwater isn’t sitting in a simple aquifer layer – it’s hidden in narrow fractures running through otherwise dry, resistive gneiss bedrock.
Most of the bedrock here is essentially watertight – solid, unfractured gneiss with no pathway for water to move through. It’s only where the rock is fractured that water can flow at all, which is exactly what this survey needed to find.
02 – The context
A well-siting campaign for the community of Kpetchihoe, Togo, and a nearby refugee camp, using tTEM to map fractured gneiss bedrock and identify a viable production well site.
PARTNER
Plan International
COUNTRY
Togo, Africa
TERRAIN
CWeathered gneiss, clay-rich saprolite, fractured bedrock
COMMUNITY
Kpetchihoe + nearby refugee camp
TECHNOLOGY
tTEM
YEAR
2022
Mapping conducted by the Hydro Geophysics Group, Aarhus University, Denmark, in collaboration with Plan International.
03 – The solution
Ground-Based Transient Electromagnetic Survey
tTEM, TEMcompany’s continuously-measuring EM system, was towed across the survey area surrounding Kpetchihoe, producing continuous resistivity profiles rather than isolated soundings — critical in terrain this variable, where a viable fracture zone can be narrower than 100 metres and easy to miss entirely with point-based methods.
Methodology
01
Survey Planning
Profiles were planned across the area surrounding Kpetchihoe to spatially screen the fractured gneiss terrain for potential well sites.
02
tTEM Acquisition
Continuous resistivity data was collected while towing the system across the survey area in March 2022.
03
Resistivity Interpretation
Conductive clay-rich saprolite and weathered zones were distinguished from highly resistive dry gneiss, with deep conductive zones interpreted as fractured, water-bearing bedrock — the primary target.
04
Site Selection
Resistivity models were combined with topographic and catchment analysis. Two sites (A and B), both where a conductive unit cut through otherwise resistive bedrock, were identified northeast of the village center; Site B was ultimately chosen for surface logistics.
04 – The results
The survey pinpointed the final well site to a vertical fracture less than 100 metres wide – a target that would have been impossible to locate without the tTEM data. Site B was drilled to 138 metres, striking water at several intervals, and was ultimately screened between 88 and 133 metres below ground.
138m
Depth drilled at site B
>20m³/hr
Well yield
<100m
Width of the fracture zone successfully targeted
The Region
01
On ridge, looking down
Kpetchihoe itself sits up on a ridge – the actual well sites are in the lower ground nearby, right where rainfall naturally ends up.
02
Two communities, one well
Whatever came out of the ground wasn’t just for Kpetchihoe – a nearby refugee camp was counting on it too.
03
Inland
This is Ahassomé canton, part of Togo’s Plateaux Region — the kind of inland farmland where finding water often comes down to exactly this kind of needle-in-a-haystack search.
04
A needle in solid rock
Most of the bedrock here is basically watertight. The only way in was a single fracture, less than 100m wide, hiding somewhere underneath it.
05 The impact
Safe water for a community — and the refugee camp beside it.
The completed well now delivers more than 20 m³/hr of safe water to the host community of Kpetchihoe and the nearby refugee camp – drawn from a fracture zone under 100 metres wide, found only because continuous tTEM profiling could see what point soundings alone would have missed.